
Project Info
Engineering the energy transition – one molecule at a time.
Category
Date
April 15, 2026
HEDGE COMMODITIES
Engineering the energy transition – one molecule at a time.
Strategic Infrastructure: 100 MMscfd LNG Plant with Dedicated SSLNG Jetty
We are proud to announce a significant milestone in mid-scale LNG infrastructure—the installation of a 100 MMscfd liquefaction facility integrated with a dedicated SSLNG marine jetty, designed to load vessels from 8,000 to 10,000 m³ capacity.
This project bridges natural gas production with coastal LNG distribution, enabling efficient, lower-carbon energy delivery to islanded grids, industrial off-takers, and marine bunkering markets.
Project at a Glance
- Parameter Specification
- Liquefaction capacity 100 MMscfd
- Jetty length 120 meters
- Vessel capacity range 8,000 – 10,000 m³
- Vessel type SSLNG carriers (Small-Scale LNG)
- Project status Under active installation
- Design philosophy Modular, mid-scale, export-ready
—
Why 100 MMscfd + SSLNG Jetty?
Most mid-scale LNG plants rely on truck loading or pipeline send-out. By adding a 120m SSLNG jetty, we unlock:
- Direct vessel loading – No intermediate storage & reloading costs
- Coastal & island access – Reach markets beyond pipeline grids
- Flexible cargo sizes – 8,000 to 10,000 m³ optimizes regional trade
- Reduced logistics chain – Lower emissions per delivered tonne