JETTY AND MARINE HIGHLIGHTS
The jetty is engineered specifically for SSLNG operations:
- Length: 120 meters – suitable for vessels up to ~10,000 m³
- Breast & mooring dolphins: Designed for tidal ranges up to 5 meters
- Loading arms: 2 x SSLNG-compatible cryogenic arms (16-inch)
- Vapor return line: Full containment for safe loading
- Emergency release system: Hydraulic quick-disconnect couplers
- Navigation aids & fendering: Rubber cone fenders + radar reflectors
Vessel compatibility:
Handles 8,000 m³ to 10,000 m³ SSLNG carriers, typical of small-scale coastal and river-sea class vessels operating in Southeast Asia, the Caribbean, and Baltic regions.
—
Installation Progress – Plant + Jetty
LNG Plant (100 MMscfd)
- Gas pretreatment (amine, dehydration, Hg removal) – Under installation
- Liquefaction cold box & MCHE – Being set in place
- Mixed refrigerant compressors (electric drive) – On schedule
- LNG storage (30,000 m³ full containment tank) – Foundation complete
SSLNG Jetty (120m)
- Piling & substructure – Underway (steel tubular piles)
- Loading platform & mooring dolphins – Prefabrication complete
- Cryogenic piping from plant to jetty head – Installation in progress
- Emergency shutdown & firefighting platform – Final integration
Both plant and jetty are being installed concurrently using modular offshore construction techniques to minimize field welding and accelerate mechanical completion.
—
Safety & Environmental Compliance
- Jetty: Compliance with SIGTTO, OCIMF, and ISGOTT guidelines
- LNG plant: API 620 / EN 14620 storage + NFPA 59A
- Vapor dispersion modeling – Completed for all loading scenarios
- Marine mammal & turbidity monitoring – Active during piling operations
- Spill containment: Secondary bunding + jetty drip trays
—
Market & Operational Impact
Once operational, the facility will:
- Load one 8,000–10,000 m³ SSLNG vessel every 5–7 days
- Supply LNG for power generation, industrial fuel switching, and marine bunkering
- Enable virtual pipelines via coastal transshipment hubs
- Reduce reliance on trucked LNG in remote regions by 60%+
—
Timeline
Milestone Target
Jetty mechanical completion Q4 2026
Plant mechanical completion Q1 2027
First LNG to storage Q3 2027
First SSLNG vessel loading Q4 2027
Looking Ahead
With the jetty in place, we are already evaluating a second liquefaction train (100 MMscfd) to double throughput while sharing the same marine infrastructure.
Partner with us for:
- Long-term SSLNG offtake agreements
- Jetty access & vessel loading services
- Tolls for third-party gas liquefaction
—